Understanding our service timelines: from website design to issue resolution
Apple
Last Update il y a 8 mois
- Website Design: It typically takes 1 to 2 weeks. This includes initial discussions and understanding of requirements with the client, the design phase by the designer, and client feedback and revisions. During the design process, we ensure that the layout, colors, fonts, etc., align with the client’s brand image and requirements. The accuracy of the website design time depends on the efficiency of the designer and the timeliness of client feedback.
- App Development: It typically takes 4 to 6 weeks. App development includes requirement analysis, interface design, coding, testing, and deployment. The accuracy of the time depends on the development team’s skill level, project complexity, and changes in client requirements.
- System Development: It typically takes 6 to 8 weeks. System development involves multiple stages, including requirement gathering, system design, coding, testing, deployment, and maintenance. The accuracy of the time depends on the size and skill level of the development team, as well as the complexity of the system and changes in client requirements.
- Website Content Update: Updating website content usually takes 1 to 3 days. The update may include text, images, videos, etc. The accuracy of the time depends on the complexity and quantity of the content update, as well as the timeliness of feedback and confirmation provided by the client.
- Issue Fixing: Fixing issues typically takes 1 to 2 days. Fixing issues involves identifying the problem, locating the cause, fixing the bug, and testing. The accuracy of the time depends on the complexity and urgency of the problem, as well as the response time and problem-solving ability of the development team.